//contact //product
You are here: Home » Products » Plastic Testing Equipment » 5-30ton Capacity Flat Vulcanizing Machine For Belt And Tire Small Vulcanizer Machine

Product Detail

5-30ton Capacity Flat Vulcanizing Machine For Belt And Tire Small Vulcanizer Machine 5-30ton Capacity Flat Vulcanizing Machine For Belt And Tire Small Vulcanizer Machine
5-30ton Capacity Flat Vulcanizing Machine For Belt And Tire Small Vulcanizer Machine 5-30ton Capacity Flat Vulcanizing Machine For Belt And Tire Small Vulcanizer Machine
5-30ton Capacity Flat Vulcanizing Machine For Belt And Tire Small Vulcanizer Machine 5-30ton Capacity Flat Vulcanizing Machine For Belt And Tire Small Vulcanizer Machine

loading

5-30ton Capacity Flat Vulcanizing Machine For Belt And Tire Small Vulcanizer Machine

Share to:
sharethis sharing button
 Voltage allowable fluctuation range: AC (220 ± 10%) V
Weight: about 350kg
Pressure table: 0 ~ 200kg / sq.cm
Cylinder speed: 11mm / s
  • DH-FV-01

  • Dahometer

  • one set

  • 7 days

  • 1 year,Lifelong maintenance

  • T/T, Visa,PayPal,Western Union

  • Negotiable

Availability:
Quantity:

5-30ton Capacity Flat Vulcanizing Machine For Belt And Tire Small Vulcanizer Machine


1.Introduction

Laboratory small plate vulcanizing machine is also called hot press molding machine, mainly used for rubber, plastic products sample making experiments, such as: tensile test, impact test, compression test sample preparation.

Plastic industry: laboratory sample making, small batch trial production, research and development,PPT,PE,PVC and so on.

Rubber industry: laboratory sample making, small batch trial production, research and development, natural rubber, silicone, silicone rubber, etc.


2.Technical Specification

1).Capacity: 5-30ton (adjustable)


2).Temperature range: normal temperature ~ 250 ° C


3).Temperature accuracy: ± 0.5 ° C


4).Temperature controller: PLC touch screen


5).Temperature control mode: PLC touch screen


6).Heating: electric heating tube heating


7).Working mode: electric heating. Heating method: electric heating.


3.Operation Method


1). First adjust the test machine horizontally, and use the level on the base of the machine, and adjust the basic screw according to the level indicator to make it level (adjust when installing the machine or moving the machine).


2). Start the main power switch and let the power supply pass through the control panels of the machine.


3). Set the test temperature.


4). Set the temperature of the upper, middle upper, middle lower and lower molds according to the requirements of the materials. After the temperature reaches the set temperature, open the cylinder door and place the stainless steel plate and the sample.


5). Start the test button to start the test on the hydraulic cylinder (do not adjust the pressure and speed of the hydraulic system).


6). The system automatically resets after the set time is reached.


7). Observe the sample and the test is over.


4.Precautions and maintenance


Precautions:


1).The display of this unit, the power of the motor is input according to the label.


2).The operator must be familiar with the operation and maintenance methods of this unit and pay attention to its use.


3).The environment should be kept clean and not wet.


4).When necessary, please pay attention to handling, do not damage the machine.


5).When replacing the jig, pay attention to pick and place, so as not to fall and bump the machine.


6).Regularly check the drive belt to see if it is looseness or not and adjust it.


7).Please apply for inspection calibration regularly to ensure accuracy.


Maintenance:


1). For the machine part, need to wipe the exterior frequently and keep it clean.


2).For the plating part, please wipe with oil to prevent rust and keep it bright.


3).Please add lubricating oil to the power screw and screw parts to ensure the transmission is sensitive. (Lubricating oil can be mainly butter and added with a little oil).


4).The panel (control box is the display) should be wiped with a dry cloth to prevent water from being damaged to IC electronic parts.


5).Please fix all fixtures and fittings and wipe the anti-rust oil to prevent rust.


5. Equipment installation requirements


Installation site


The ground is flat and well ventilated. There is no strong vibration,electromagnetic flammable, explosive, corrosive substances and dust around the equipment. There is proper use and maintenance space around the equipment.


 1). External temperature: 27°C±3°C Relative humidity: ≤85% Air pressure: 86kPa~106kPa


 2).There must be a certain space around the equipment for easy maintenance.


  A: not less than 10cm B: not less than 60cm C: not less than 60cm


 Power supply conditions


1). Power supply: AC220V two-wire + protective ground wire


 Voltage allowable fluctuation range: AC (220 ± 10%) V


 Frequency allowable fluctuation range: (50 ± 0.5) Hz


 Protective earthing wire grounding resistance is less than 4Ω


2).The requirements of the storage environment


When the equipment is not working, the temperature of the environment should be kept within 5 °C ~ +30 °C

4

 

Previous: 
Next: 

Related Products

About Us

Guangdong Hongtuo Instrument Technology Co.,Ltd has been specializing in density testing field on developing, innovating and producing since the year it was establised.

Contact Us
​​​​​​​​​​​​​​ 
   Contact:Julie Zhong
   Tel:+86-0769-22403424
   Mobile/WhatsApp:+86 13267004347
  Email:sales03@hongtuo.com.cn
  Address:No. 2-1, Xinya Road, The Third Industrial Park, Dalingya Village, Daojiao Town, DongGuan, GuangDong, CN
Copyright  2021 Guangdong Hongtuo Instrument Technology Co.,Ltd Technology by www.leadong.com